TAJUK : CADANGAN MENYIAPKAN SLIPWAY DI LIMBUNGAN CRYSTALMARS SDN BHD
DI TEPI TEBING SUNGAI HUTAN MELINTANG, PERAK.
- MODAL ANGGARAN = RM 1.5 JUTA
- KEGIATAN UTAMA = MEMBAIK PULIH BOT-BOT NELAYAN LAUT DALAM SERTA
BOT MARITIM.
- TEMPOH MENYIAPKAN SLIPWAY = 2 BULAN
- TARIKH BEROPERASI = BULAN KE-3
- PENGURUSAN PROJEK = DI URUSKAN SECARA USAHASAMA ANTARA PIHAK
KOPERASI KAMI DENGAN SYARIKAT YANG BERMINAT.
- PULANGAN MODAL SEMULA = TIDAK MELEBIHI 3 TAHUN
- JADUAL PERLAKSANAAN PROJEK :
. DI JANGKA TIDAK MELEBIHI 2 BULAN. INI DISEBABKAN SEPARUH DARI
KEPERLUAN ASAS TELAH SIAP DI BINA.
- ANGGARAN PENDAPATAN UNTK 1 SLIPWAY :
KERJA MENAIK DAN MENURUNKAN BOT = RM 3,500
KERJA - KERJA MENGECAT BOT = RM 3,500
MEMBAIK PULIH KEROSAKAN KECIL = RM 5,000.
= RM 12,000
- JUMLAH :
- 1 SLIPWAY x 6 BUAH VESSEL SEBULAN = RM 12 ,000 x 6 = RM 72,000
- 3 SLIPWAY = RM 72,000 x 3 = RM 216,000
- SEWA SLIPWAY = RM 200 x 25 HARI x 3 = RM 15,000
JUMLAH PENDAPATAN KASAR = RM 231,000
JUMLAH PERBELANJAAN SEBULAN =
1. GAJI, BIL DAN SEWA SLIPWAY = RM 37,500
2. BAYARAN BALIK PINJAMAN = RM 45,000
= RM 82,500
JUM. PEND. KASAR - JUM. PERBELANJAAN = RM 231,000 - RM 82,500
JUMLAH PEND. BERSIH = RM 148,500
Pecahan Share : 60% / 40 %
Pihak Funder : 60 % (*)
Pihak Syarikat : 40 %
email to :gemersiknada@gmail.com
hanif 017.352.3130
Niche: Mencari Pelabur | Kontraktor Marin Dan Kapal Laut | Kontraktor Pembinaan
DI TEPI TEBING SUNGAI HUTAN MELINTANG, PERAK.
- MODAL ANGGARAN = RM 1.5 JUTA
- KEGIATAN UTAMA = MEMBAIK PULIH BOT-BOT NELAYAN LAUT DALAM SERTA
BOT MARITIM.
- TEMPOH MENYIAPKAN SLIPWAY = 2 BULAN
- TARIKH BEROPERASI = BULAN KE-3
- PENGURUSAN PROJEK = DI URUSKAN SECARA USAHASAMA ANTARA PIHAK
KOPERASI KAMI DENGAN SYARIKAT YANG BERMINAT.
- PULANGAN MODAL SEMULA = TIDAK MELEBIHI 3 TAHUN
- JADUAL PERLAKSANAAN PROJEK :
. DI JANGKA TIDAK MELEBIHI 2 BULAN. INI DISEBABKAN SEPARUH DARI
KEPERLUAN ASAS TELAH SIAP DI BINA.
- ANGGARAN PENDAPATAN UNTK 1 SLIPWAY :
KERJA MENAIK DAN MENURUNKAN BOT = RM 3,500
KERJA - KERJA MENGECAT BOT = RM 3,500
MEMBAIK PULIH KEROSAKAN KECIL = RM 5,000.
= RM 12,000
- JUMLAH :
- 1 SLIPWAY x 6 BUAH VESSEL SEBULAN = RM 12 ,000 x 6 = RM 72,000
- 3 SLIPWAY = RM 72,000 x 3 = RM 216,000
- SEWA SLIPWAY = RM 200 x 25 HARI x 3 = RM 15,000
JUMLAH PENDAPATAN KASAR = RM 231,000
JUMLAH PERBELANJAAN SEBULAN =
1. GAJI, BIL DAN SEWA SLIPWAY = RM 37,500
2. BAYARAN BALIK PINJAMAN = RM 45,000
= RM 82,500
JUM. PEND. KASAR - JUM. PERBELANJAAN = RM 231,000 - RM 82,500
JUMLAH PEND. BERSIH = RM 148,500
Pecahan Share : 60% / 40 %
Pihak Funder : 60 % (*)
Pihak Syarikat : 40 %
email to :gemersiknada@gmail.com
hanif 017.352.3130
Niche: Mencari Pelabur | Kontraktor Marin Dan Kapal Laut | Kontraktor Pembinaan
1. Mizzie - Mon 3/Sep/2012, 3:55pm
assalamualaikum En Hanif
boleh emailkan info yang berkaitan ke
mizzie2920@yahoo.com
saya akan cuba berbincangkan dengan pihak pengurusan kami
terima kasih
assalamualaikum En Hanif
boleh emailkan info yang berkaitan ke
mizzie2920@yahoo.com
saya akan cuba berbincangkan dengan pihak pengurusan kami
terima kasih
Page 1 (Total 2 comments)